Articulating Loader » History » Revision 13

« Previous | Revision 13/17 (diff) | Next »
Danny, 11/22/2022 11:06 AM


h1. Articulating Loader

Rationale

Methodology

Preliminary Thoughts

Donor Vehicle

Chassis

Hydraulics

Boom Design

Boom Attachments



h2. TODO

h3. Infrastructure

Set up repo and get WC established on workstation

Fix the DNS so bushidosoftware.com works with the Redmine instance

Configure Redmine to allow public access to the project wiki

**Fix solvespace to allow variables to be defined and used in dimensioning formulae

h3. Prebuild

Organize the Shop

Get machine shop in SE corner

Finish wiring small room lights

Get workbenches into small room

Finish wiring carriage lights and N wall

Add 220V drops to machine shop area

Insulate N wall and finish drywall there

Sort out milling machine

Power

Collet(s)

Finish muller build

Build grinder

Fix wheels on welding table

Build crane

h3. Build

Decide if a Samurai's drivetrain is strong enough as a base for this build

a. If not, decide what vehicle to use

Acquire donor vehicle(s)

a. Determine hydraulic motor required to power the drivetrain
b. Determine hydraulic pump required to drive the hydraulic motor
c. Decide if second hydraulic pump is required for steering, boom operation, and auxiliary features
d. Determine the engine required to drive the hydraulic pump(s)