Project

General

Profile

TODO » History » Version 1

Danny, 11/30/2022 07:36 PM

1 1 Danny
h1.  TODO 
2
3
h3. Infrastructure
4
5
# -Set up repo and get WC established on workstation-
6
# Fix the DNS so bushidosoftware.com works with the Redmine instance
7
# -Configure Redmine to allow public access to the project wiki-
8
# **Fix solvespace to allow variables to be defined and used in dimensioning formulae
9
10
h3. Prebuild
11
12
# Organize the Shop
13
## Get machine shop in SE corner
14
## Finish wiring small room lights
15
## Get workbenches into small room
16
## Finish wiring carriage lights and N wall
17
## Add 220V drops to machine shop area
18
## Insulate N wall and finish drywall there
19
# Sort out milling machine
20
## Power
21
## Collet(s)
22
# Finish muller build
23
# Build grinder
24
# Fix wheels on welding table
25
# Build crane ( source:/gantry.crane/0.assembly.slvs )
26
27
h3. Build
28
29
# Decide if a Samurai's drivetrain is strong enough as a base for this build
30
a. If not, decide what vehicle to use
31
# Acquire donor vehicle(s)
32
a. Determine hydraulic motor required to power the drivetrain
33
b. Determine hydraulic pump required to drive the hydraulic motor
34
c. Decide if second hydraulic pump is required for steering, boom operation, and auxiliary features 
35
d. Determine the engine required to drive the hydraulic pump(s)