TODO » History » Version 4

Danny, 11/30/2022 08:35 PM

1 1 Danny
h1.  TODO 
2
3
h3. Infrastructure
4
5
# -Set up repo and get WC established on workstation-
6
# Fix the DNS so bushidosoftware.com works with the Redmine instance
7
# -Configure Redmine to allow public access to the project wiki-
8
# **Fix solvespace to allow variables to be defined and used in dimensioning formulae
9
10
h3. Prebuild
11
12
# Organize the Shop
13
## Get machine shop in SE corner
14
## Finish wiring small room lights
15
## Get workbenches into small room
16
## Finish wiring carriage lights and N wall
17
## Add 220V drops to machine shop area
18
## Insulate N wall and finish drywall there
19
# Sort out milling machine
20
## Power
21
## Collet(s)
22 4 Danny
# Finish muller build (to get it out of the way)
23 2 Danny
# Build grinder (requires some castings)
24 1 Danny
# Fix wheels on welding table
25 3 Danny
# 4x4 CNC plasma table
26 1 Danny
# Build crane ( source:/gantry.crane/0.assembly.slvs )
27
28
h3. Build
29
30
# Decide if a Samurai's drivetrain is strong enough as a base for this build
31
a. If not, decide what vehicle to use
32
# Acquire donor vehicle(s)
33
a. Determine hydraulic motor required to power the drivetrain
34
b. Determine hydraulic pump required to drive the hydraulic motor
35
c. Decide if second hydraulic pump is required for steering, boom operation, and auxiliary features 
36
d. Determine the engine required to drive the hydraulic pump(s)