h1.  TODO 
2
3
h3. Infrastructure
4
5
# -Set up repo and get WC established on workstation-
6
# Fix the DNS so bushidosoftware.com works with the Redmine instance
7 5 Danny
# Update public web access on dev machine (projects.bushidosoftware.com) to have a proper SSL cert that auto-renews
8 1 Danny
# -Configure Redmine to allow public access to the project wiki-
9
# **Fix solvespace to allow variables to be defined and used in dimensioning formulae
10
11
h3. Prebuild
12
13
# Organize the Shop
14
## Get machine shop in SE corner
15
## Finish wiring small room lights
16
## Get workbenches into small room
17
## Finish wiring carriage lights and N wall
18
## Add 220V drops to machine shop area
19
## Insulate N wall and finish drywall there
20
# Sort out milling machine
21
## Power
22
## Collet(s)
23 4 Danny
# Finish muller build (to get it out of the way)
24 2 Danny
# Build grinder (requires some castings)
25 1 Danny
# Fix wheels on welding table
26 3 Danny
# 4x4 CNC plasma table
27 1 Danny
# Build crane ( source:/gantry.crane/0.assembly.slvs )
28
29
h3. Build
30
31
# Decide if a Samurai's drivetrain is strong enough as a base for this build
32
a. If not, decide what vehicle to use
33
# Acquire donor vehicle(s)
34
a. Determine hydraulic motor required to power the drivetrain
35
b. Determine hydraulic pump required to drive the hydraulic motor
36
c. Decide if second hydraulic pump is required for steering, boom operation, and auxiliary features 
37
d. Determine the engine required to drive the hydraulic pump(s)